Laboratory Relocation Checklist

A laboratory move is an equipment project, a compliance project and a logistics project at once. The instruments are usually the easiest part.

Plan (3-12 months out)

  • Full asset inventory with weights, dimensions, utilities and vendor move requirements
  • Decide what moves, what is replaced, and what is disposed of
  • Confirm new site readiness dates for utilities, ventilation and casework
  • Identify methods that cannot be offline, and arrange continuity or subcontracting
  • Book specialist movers, riggers and vendor decommissioning early
  • Plan sample, reference material and archive transport, including cold chain
  • Notify clients, accreditation bodies and regulators as required

Prepare (4-8 weeks out)

  • Run down chemical stock; hazardous material transport is regulated and costly
  • Arrange waste disposal and cylinder returns
  • Decontaminate equipment and issue certificates for each item
  • Back up instrument computers, LIMS and data, and verify the backups
  • Label everything against the inventory and the new floor plan
  • Confirm insurance covers the move and transit value

Move

  • Vendor decommissioning for sensitive instruments where required
  • Environmental and shock monitoring for delicate equipment in transit
  • Maintain cold chain and custody records for samples throughout
  • Sequence delivery so critical instruments install first
  • Have someone on site at both ends against the inventory

Restart

  • Reinstall, requalify and performance-verify each instrument before use
  • Verify utilities, ventilation and hood performance at the new site
  • Reverify methods where the environment materially changed
  • Update documentation, addresses, layouts and accreditation records
  • Run parallel or control samples before releasing client results
  • Retain the old site until restart is genuinely proven, where possible