New Laboratory Setup Checklist

Most new laboratory problems trace back to decisions made before anyone drew a floor plan. Work outwards from the tests you intend to perform.

Start with the project driver and decision brief

New build, expansion, relocation and new-capability projects have different risks. Define the work you will keep in-house and the evidence needed before equipment is ordered.

  • Project driver: new laboratory, expansion, relocation or a new testing capability; define what stays outsourced.
  • Methods, product/sample types, reporting limits, daily volume and growth assumptions; separate instrument capacity from preparation and review capacity.
  • Site and utilities: floor plan, access, floor loading, ventilation, power, gases, water, waste and EHS responsibilities; have qualified designers assess suitability.
  • New versus used equipment: configuration, accessories, service/software support, installation, calibration and qualification documentation—not purchase price alone.
  • Readiness: method verification/validation as applicable, LIMS and records, trained staff, controls, acceptance criteria and accountable sign-off before customer work.
  • Budget range, location, target milestones and available equipment lists or drawings; confidential documents can follow after the first inquiry.

1. Define scope and requirements

  • List the tests and methods the laboratory will perform, and expected volumes
  • Identify the standards, regulations or accreditation scope you must satisfy
  • Decide what will be outsourced rather than built in-house
  • Establish turnaround and capacity targets that drive equipment count
  • Agree a realistic budget covering fit-out, equipment, staffing and first-year running costs

2. Space, utilities and infrastructure

  • Space per method, including sample receipt, storage and archive
  • Segregation of incompatible activities: trace metals, microbiology, sample prep, dirty work
  • Ventilation, fume hoods, biological safety cabinets and air change requirements
  • Power quality, backup power, and dedicated circuits for sensitive instruments
  • Gases, compressed air, vacuum, purified water and drainage
  • Temperature, humidity, vibration and electromagnetic considerations for sensitive instruments
  • Access routes and floor loading for large equipment
  • Network, data and instrument connectivity

3. Equipment and casework

  • Instrument list derived from methods, with redundancy where downtime is unacceptable
  • Lead times, which often govern the project schedule
  • New, used or leased decisions per instrument
  • Benching, casework, sinks and storage designed around workflow
  • Calibration, installation and qualification planned before delivery
  • Consumable and reagent supply arrangements

4. Safety, quality and people

  • Risk assessments, chemical inventory, storage and waste routes
  • Emergency equipment: showers, eyewash, spill response, alarms
  • Quality system: documents, SOPs, calibration control, training records
  • Method validation and verification plan before results are released
  • Proficiency testing and quality control materials
  • Recruitment and training timeline, which is often the longest lead item

5. Commissioning and go-live

  • Systems commissioning, including ventilation and utilities verification
  • Instrument installation, qualification and performance verification
  • LIMS configuration, master data and reporting templates
  • Method validation, trial runs and staff competency sign-off
  • Accreditation application timing, where relevant
  • A soft-launch period before committing to external turnaround promises