Equipment Requalification After Relocation — IQ/OQ/PQ Verification

Moving a qualified instrument is a change event. Which systems need full requalification versus verification should follow a documented risk assessment — not a blanket rule.

What does it measure?

  • Installation qualification at the new site: utilities, environment and configuration against requirements.
  • Operational and performance qualification depth set by the risk assessment and your quality system.
  • Calibration and metrological traceability re-established where transport could affect measurement performance.

When is it used?

  • Full laboratory relocation
  • Single-instrument moves between sites
  • Post-move audit or accreditation evidence
  • Return-to-service after building works

Sample considerations

  • Provide the instrument inventory with manufacturer, model and criticality.
  • Describe move distance, transport conditions and utility differences at the new site.
  • State quality-system requirements and target restart dates; acceptance criteria should be agreed before the move.

Laboratories with relevant capabilities

  • Element Materials Technology (Aberdeen, Scotland) — Materials Testing, Mechanical Testing, Metallurgical Analysis
  • Laboratory Testing Inc. (Hatfield, PA) — Materials Testing, Mechanical Testing, Chemical Analysis
  • CSA Group (Toronto, Ontario) — Product Safety, Electrical & EMC, Environmental Testing
  • Composite Test & Evaluation Ltd (Honiton, Devon) — Composites Testing, Mechanical Testing, Fatigue Testing
  • Electromagnetic Testing Services Ltd (Great Dunmow, Essex) — EMC Testing, Electronics Testing, Calibration
  • Labcal Limited (Lymington, Hampshire) — Calibration, Metrology

Confirm standard edition, jurisdiction and actual laboratory scope. Service references are not partnerships or endorsements.

Request testing · Provider directory