Adding a New Laboratory Testing Capability

Adding a testing capability starts with the methods and standards you need to run, the sample volumes you expect and whether results must be accredited. Those decisions drive the instrument, the supporting equipment, the facility and utility work, calibration and service arrangements, staff training and method validation. Many organizations outsource first, then bring the work in-house once volumes and methods are proven.

The planning sequence

  • Define the methods, standards, matrices and detection or load ranges required
  • Estimate annual volume and turnaround targets
  • Identify the instrument category and the supporting equipment around it
  • Check space, utilities, gases, ventilation and environmental control
  • Plan installation, calibration, qualification and service
  • Plan staff training, method validation and quality-system updates
  • Compare against outsourcing the same work

Capability guides

Choose the capability below for equipment categories, facility considerations and the standards commonly involved.

Common questions

Should we outsource before adding a capability?
Often, yes. Outsourcing first establishes methods, acceptance criteria and real volumes, which makes specifying equipment much easier.
Does a new capability need accreditation?
Only if your customers, regulators or contracts require accredited results. If so, the new method must be added to your accreditation scope, which takes time and evidence.

Submit a lab request · Start a lab project